The focus of this EXES meeting is on scheduling.

JL had a meeting with P. Kelton and J. Booth regarding engineering support from McDonald. One worry is that we are underestimating the engineering support needed. A bigger worry is that no engineering help is available for forseeable future.

TEXES schedule (test EXES)

EXES opto/mech/cryo proposed schedule

Proposed alternative schedule that waits until Jan when HET engineers are available was discussed. JL will be less available once classes start. Generally decided to pursue proposed schedule. Contact outside astronomy groups for information about available engineers. The tail end of the adopted schedule is probably too optimistic.

EXES electronics schedule

EXES software schedule

EPO (report)
-plane tour for October because plane mothballed outside on tarmac.
-2 people haven't come to any meetings. MKH to see if they're still interested. Room for more.
-MKH has contacted science person at AISD about further recruiting.
-MKH gave 5 talks in MS (two colleges, two high schools, and one public)

ACTION ITEMS:
JL:
-start purchase order for test grating
-start 1/4 size scale machining (check access to Mech E oven for annealing)
-talk with other astronomy instrument builders about engineering help
-talk with McD about engineering support

MKH:
-contact EPO participants regarding tour date change after making arrangements with Raytheon
-contact no-shows about continued participation
-arrange travel payments for Spring EPO participants

MR:
-detail software block diagram
-prepare FAA layout drawings
-finish 1/4 size scale bar
-electronics specs writeup

Dan:
-Public talk


Link to the glossary