Minutes from March 1998 EXES Meeting

Link to the glossary


JL, DJ, MKH, MR, and Juergen Stutzki attending

MaryKay:
-Good experience in Cape Town. EPO important motivation for SALT
-Will focus on Spectroscopy in March Teachers' Meeting. Has various classroom exercises. Afternoon talk on echelon by JL.
-DJ asked how SOFIA EPO helps SI team EPO activities (JS raised issue with regards to his German instrument). MKH is on the Working Group on EPO and feels more support is needed; will push further.
-MR talked w/RESY contact for SOFIA tour. Will pass information on.
-Report of last EPO session: Computer seemed like good activity. We need to find cost for raytracing program. -MR to get documents on web.

Matt:
-2 weeks spent w/SPIE papers (as for John and Dan)
-Couple days spent on Optics session for Feb EPO session.
-Report on Waco Mtg for FAA issues (3/11-12).

-Report on SSSC mtg (3/13)

Dan:
-Electronics still in process. Hope for more progress soon. MR needs to give listing of where we are now for DJ to proceed.

John:
-Order to Hyperfine for both gratings
-Need to order substrate machining (12 wk) [Note: will want LN-212 F cycling] Issue of time delay vs. risk. Call more vendors.
-McD may have draftsperson by end of month, but maybe no engineering. Will mechanical slip until engineer available?
-Schedule:
Should have accomplished already:
opto-mechanical done
Structural Design no
DAQ conceptual design part
Electronics ordered no
Detector ordered no

This month:
Detail design  
Structural Analysis  
Order optics (most slippable)
Grating Substrate prepared  
Define Software  

ACTION ITEMS:

MaryKay:
prepare March EPO (responsible for food)
Handle reimbursement paperwork
contact Zemax and Beam 2 for raytrace
help MR get documents on web
prod SOFIA EPO about supporting groups

Matt:
get documents on web
get SOFIA tour info to MK
develop software block diagram
prepare electronics for Dan
contact vendors for grating substrate
work on FAA information for Pernic
Structural issues
operational scenarios
Talk with detector experts at SPIE

Dan:
electronics issues
operational scenarios
Talk with detector experts at SPIE

John:
operational scenarios
Talk with detector experts at SPIE
order substrate
prepare grating talk for EPO
decide on schedule slippage
structural design
email Wiltsee re: tertiary/button


Link to the glossary