Minutes from August 1999 EXES Meeting
Link to the glossary
John, Dan, Mary Kay, and Matt attending
Electronic and Software:
The design of the header board and TEXES cables is complete. Dan needs to
know when the detector will arrive. Wallace has shipped hardware.
Everything should work except
ethernet card. The software to be provided will include
EPROMs with variety of
clocking patterns. Wallace needs to communicate with Raytheon about
detector clocking patterns.
Matt is compiling a list of minimum software required for winter observing run.
EPO:
We are recruiting new teachers. Mary Kay will make specific attempt to recruit
from AISD.
We have gotten money (~$300) from NASA for 2 teachers. Haven't heard on
one request.
Meeting dates for Fall are Sept 18, Oct 16, and Nov 20.
Optics:
CO2 laser tests of 36 inch grating inside TEXES going well.
More tests coming.
Dewar Design:
Design is progressing slowly. John expects design could be done in 2 months.
John wants to know the level of design required for FAA Critical Airworthiness
Design Review. John is concerned that Jeff Cottrell (McDonald draftsman) may
be leaving before design is entered into mechanical desktop.
Action Items:
Mary Kay:
Matt:
John: