Minutes from April 1998 EXES Meeting

Link to the glossary


JL, DJ, MKH, and MR attending

MaryKay:
-link to EXES web site from SOFIA web site now established
-March EPO meeting went well. Covered Spectroscopy and included grating making demo in lab. Grating making may not have reached closure. Do summary talk next meeting.
-Will focus on Use of Spectroscopy in April Teachers' Meeting. Use Palomar Sky Survey charts to show colors (MKH). Doppler demo and talk (MR). Grating summary (JL).
-MK on for juice & donuts. MR on for coffee. Lunch at Posse.

Matt:
-Web up to date.
-Report on FAA IPT progress: expect a document by end of April outlining procedure. This is document that should have come out Dec 1997.
-Have passed software block diagram on to Dan for iteration.
-Need to talk w/ Don Figer (UCLA) re: NIRSPEC software.
-Have worked out thermal modeling program. Believe hold time can be improved with vapor-cooled shields. Will be testing program with Irshell.
-Need to schedule dewar design alternative meeting and operational scenarios meeting.

Dan:
-Electronics still in process. Russell Wallace has sent some hardware (Luke tested and works well). DJ will talk with Russell Wallace further regarding systems.
-Will get electronics outline of current needs to Matt this week so that Matt can contact people met at SPIE.
-SOFIA Council meeting is set for May 5,6. Will bring up button, image motion, and software development. Will talk with Stutzki re: tertiary size and secondary load path for primary mirror.

John:
-Optical design work at low level.
-Test grating:

Schedule:
This month:
Detail design and drafting high priority; need at least conceptual
optical design details impacts dewar design
order electronics and detector fairly high priority, probably extend to next month
define software continue progress

ACTION ITEMS:

MaryKay:
prepare April EPO (responsible for morning food)
arrange for ordering EPO materials (4-inch diffraction gratings)

Matt:
EPO Doppler demo (and morning coffee)
Schedule scenario meeting: John, Dan, & Matt
Schedule dewar design alternative meeting: John & Matt (+Dan)
Contact Don Figer (UCLA) re: NIRSPEC software
Contact Alan Hoffman (SBRC) re: chip availability
Study impact of 128^2 Boeing lo-background array
Calculate warp from 5mm cut
Continue with Software Definition
pursue contacts with electronics vendors established at SPIE
Begin assembling FAA information based on IPT notebook

Dan:
revise software block diagram
electronics issues
contact Stutzki re: tertiary size and secondary load path for primary mirror

John:
EPO summary on gratings
contact Hyperfine re: test grating substrate
optical design details
conceptual dewar design


Link to the glossary

Return to EXES Homepage

This document last updated: 16 April, 1998